Project management for manufacturing and industrial teams in Salesforce

Schedule-driven projects, from order to installation.

Equipment builds, tooling programs, installations and capital projects depend on long chains of tasks and shared engineering resources. Inspire Planner schedules them in Salesforce, next to the customer and the order.

4.95/5 from 175+ reviews on AppExchange
Illustration: a factory, gears and a conveyor with a stage gate card
HOW PROJECTS RUN

From order to installed and approved

How build-and-install projects usually move from order to sign-off. Your stage names will differ; the dependencies between them hold.

  1. 1 Order and kickoff Purchase order received, scope confirmed, project created.
  2. 2 Engineering and design Drawings, approvals and customer sign-off.
  3. 3 Build or procurement Fabrication, tooling or supplier lead times.
  4. 4 Installation and commissioning On-site work with field teams and subcontractors.
  5. 5 Acceptance Testing, sampling or customer approval, then closeout.
Resource Management utilization for seven team members over five weeks: Priya Shah over-allocated at 130 percent in two weeks, shown by project, with others between 45 and 100 percent.
ONE LATE PART

A supplier slips. The schedule follows.

Dependencies in the Project Gantt carry a late part through assembly, test, shipping and installation, so the plan shows the real finish date.

Diagram: a supplier part ships one week late and every dependent task, from final assembly to commissioning, moves one week in the schedule
Dependencies drive the schedule Manufacturing plans are long chains of dependent tasks, so a late part moves everything after it automatically.
Shared people, visible Resource Management shows how a delay on one project affects the same engineers or field technicians on others.
Approvals inside the plan Design reviews, customer sign-offs and stage gates are tasks and milestones, not emails.
Illustrative example, not a customer plan. Patterns drawn from Inspire Planner onboarding and customer success work with teams in this industry.
A STARTING TEMPLATE

An equipment project template

A simplified structure for a build-and-install project.

Who works in it
Project and program managers Engineers and field technicians, in the Task Console Plant and operations leaders, in dashboards
WBSTASKTYPE
1 Order and kickoff Phase
1.1 Purchase order received Milestone
1.2 Kickoff and scope confirmation Task
2 Engineering Phase
2.1 Design and drawings Task
2.2 Customer design approval Milestone
3 Build Phase
3.1 Procurement and lead times Task
3.2 Fabrication Task
3.3 Factory acceptance test Checklist
4 Installation Phase
4.1 Site installation Task
4.2 Commissioning Milestone
4.3 Customer acceptance Milestone
TRUSTED BY PROJECT TEAMS AT

How teams like these run delivery in Salesforce. Read customer stories ›

Questions from manufacturing & industrial teams

Can we model the impact of a delay on other projects?

Yes. Dependencies reschedule the project, and Resource Management shows the effect on shared resources across projects.

Can subcontractors take part?

Yes. Subcontractors see and update the tasks you share with them in Inspire Planner - External Portal 2.0, with no Salesforce license.

Do you replace our ERP?

No. Inspire Planner runs the projects in Salesforce. Your ERP stays the system for orders, inventory and accounting.

Can we start from a standard template and adjust it per customer?

Yes. Start from a template per product or program type, then add or remove tasks for each customer.

What license do engineers and technicians need?

Engineers and technicians who work the plan need a Salesforce license (Platform Starter is the minimum) and an Inspire Planner Contributor license. Planners who build or change the schedule use a Standard license.

See a late part move the whole plan.

Bring one equipment project. We’ll show what a supplier slip does to it, live in Salesforce.